Hi, I am an electrician and have just started a small shop job which will become a restaurant. rewiring and new fire alarm installed fairly recently. major works to the ground floor mean that I basically have to remove all of the wiring on that level and start again.
3 zones on the system, one for each floor.
I've not really done anything with fire alarm panels but thought id have a go at removing zone 1 and keeping the rest running. only a user guide on site no installers guide. user guide talks about disabling a zone but obviously doing this just means it beeps at you until you reinstate it. tried just taking the wiring out but again just shows fault and beeps. then tried wiring just the last detector on the circuit straight into the panel thinking its dip switches may be set for end of line and then it would just operate as normal but without all the detectors and call points. again just displayed a fault and beeped at me.
Presumably the zone needs reprogramming. can anyone point me in the right direction? building is unoccupied but terraced so would like to keep upper floors running for the duration of the works.
I will bring in a specialist to design the new zone/zones for downstairs and get them to fit and commission.
Thanks in advance
Martyn
3 zones on the system, one for each floor.
I've not really done anything with fire alarm panels but thought id have a go at removing zone 1 and keeping the rest running. only a user guide on site no installers guide. user guide talks about disabling a zone but obviously doing this just means it beeps at you until you reinstate it. tried just taking the wiring out but again just shows fault and beeps. then tried wiring just the last detector on the circuit straight into the panel thinking its dip switches may be set for end of line and then it would just operate as normal but without all the detectors and call points. again just displayed a fault and beeped at me.
Presumably the zone needs reprogramming. can anyone point me in the right direction? building is unoccupied but terraced so would like to keep upper floors running for the duration of the works.
I will bring in a specialist to design the new zone/zones for downstairs and get them to fit and commission.
Thanks in advance