Hey guys - got some screed coming tomorrow, but now I've finished up the insulation and revealed the existing floor I'm a bit lower than I anticipated. To get to same floor height is just under 100mm. I knew it would be high, but thought more like 85mm
Concrete company reckon their screed will be okay, but I just wondered if I'd be alright putting some 25mm PIR on top of the existing insulation (120mm PIR).
Another alternative would be to come low and top it up with a liquid screed/self levelling compound after I guess.
Or am I over thinking as usual and should I just crack on? Concrete company said just to keep a light mist of water on top and doors and windows closed
Concrete company reckon their screed will be okay, but I just wondered if I'd be alright putting some 25mm PIR on top of the existing insulation (120mm PIR).
Another alternative would be to come low and top it up with a liquid screed/self levelling compound after I guess.
Or am I over thinking as usual and should I just crack on? Concrete company said just to keep a light mist of water on top and doors and windows closed