I obtained planning permission to build a 3 bed house on the site of a workshop I own a few years ago and I’ve done nothing. Trouble is, it expires this October. I understand that if it is started, that keeps the planning permission live. I’m not ready to build or sell yet so I was wondering what is the cheapest way I could technically make a start to prevent the permission from expiring? Would installing the drains be good enough - it would involve digging up some of the workshop floor and yard plus breaking into my neighbours manhole (He is currently end of terrace but mine will be when it’s finished) or perhaps even extending his drain to a manhole on my property. Surely the drains go in before footings? Any ideas?
 
Sponsored Links
Drainage might not be regarded as a substantial start, as anyone could dig a trench and lay a pipe.
What would definitely count is excavating for foundations, and pouring and levelling the concrete; this is something which
is basic to the design of the building - drainage runs might not be.
 
Sponsored Links
Ok thanks. Problem I have is that to do the foundations I have to demolish the workshop as the building will be the same footprint mostly. Currently the workshop has a single skin wall and probably 12” of foundation if that!
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top