Put it on before the scratch coat. I usually run a 2"x1" batton all the way round the dpc and sit my bead on it.Then fix beads with "obo's" with washers. I also put a coat on the bead building it out abit, so when the scratch goes on it can go on top of that coat so you can keep the float coat all the same thickness.It makes it uniform when you float and sponge the bell bead in..
thank you mate so along the black line? if i was to scratch it and not do it for a week or so and its over thermolite blocks btw. would u soak the wall with a hose b 4 u top coated