hi Ive had a quote for some ceramic tiles to be put on my bathroom walls. the guy is charging £39 a sq metre and recons its 25sq m to do.
Ive worked it out myself roughly and think its 20 or maybe 21 sq m.
After the work was done he used up about 25 sq m of tiles ( 25 packs) but there was only 20 sq m on the walls ( bits of waste tiles after cutting maybe used the other 4 m or so ! )
Should he charge me for the 21 m or the 25 m that appears to have been used to do the bathroom walls ? Thanks |
|
| Back to top |
|
|
|
If you do not want to see this advert, click here to login or if you are new click here to join free. |
 |
ei8htbuildingservices

Joined: 28 Mar 2012 Posts: 13 Location: London, United Kingdom Thanked: 2 times
|
|
| Back to top |
|
|
|
 |
prceramics

Joined: 18 Jan 2012 Posts: 82 Location: Buckinghamshire, United Kingdom Thanked: 6 times
|
Posted: Thu Mar 29, 2012 6:34 pm |
|
|
did he include grout and addy in the m2 price ? |
|
| Back to top |
|
|
|
 |
Jasonb

Joined: 20 Aug 2004 Posts: 2420 Location: Surrey, United Kingdom Thanked: 91 times
|
Posted: Thu Mar 29, 2012 6:49 pm |
|
|
A m2 price should be based on what the actual wall area is not the amount of tiles bought.
By quoting just a m2 price he should have taken all labours (cutting, corners, narrow widths) into account, though on a proper job all these items would be measured and priced separately.
Jason (who used to be a surveyor) |
|
| Back to top |
|
|
|
 |
andrew17

Joined: 12 Jan 2010 Posts: 47 Location: Suffolk, United Kingdom
|
Posted: Thu Mar 29, 2012 9:29 pm |
|
|
Thanks Jason . The job has been done and i really should have queried it earlier .I dont think he was trying to catch me out but i had a quote for bathroom half tiled and full , but a big part of one wall is in the eaves above half tile height so this made up about 3 m of the overestimate. Then there was a further 2 in my opinion just as an error . So 25m should have been 20m
The quote did inc adhesive and grout and trim etc
I suppose as he gave me a breakdown it was easier for me to spot and i did say to him I reconed it needed 20m but he sort of ignored me as probably didnt want to admit he worked it out wrong. But then the cheeky devil didnt decrease the final bill . he fitted the bathroom out aswell -- so was a bathroom fitter rather than a tiler. No prob with the job , it was good, but 5m at 39 quid a pop is a fair bit to me and i would have rather had it in my pocket than his. |
|
| Back to top |
|
|
|
|
|
 |
prceramics

Joined: 18 Jan 2012 Posts: 82 Location: Buckinghamshire, United Kingdom Thanked: 6 times
|
Posted: Fri Mar 30, 2012 6:48 pm |
|
|
| andrew17 wrote: | Thanks Jason . The job has been done and i really should have queried it earlier .I dont think he was trying to catch me out but i had a quote for bathroom half tiled and full , but a big part of one wall is in the eaves above half tile height so this made up about 3 m of the overestimate. Then there was a further 2 in my opinion just as an error . So 25m should have been 20m
The quote did inc adhesive and grout and trim etc
I suppose as he gave me a breakdown it was easier for me to spot and i did say to him I reconed it needed 20m but he sort of ignored me as probably didnt want to admit he worked it out wrong. But then the cheeky devil didnt decrease the final bill . he fitted the bathroom out aswell -- so was a bathroom fitter rather than a tiler. No prob with the job , it was good, but 5m at 39 quid a pop is a fair bit to me and i would have rather had it in my pocket than his. |
if your happy with the job mate whats the problem even though £39 per m2 is a little steep for a bathroom fitter i charge £25 and do it for a living and did he tank your wet ereas i pusume you have a shower ? |
|
| Back to top |
|
|
|
 |
andrew17

Joined: 12 Jan 2010 Posts: 47 Location: Suffolk, United Kingdom
|
Posted: Fri Mar 30, 2012 9:31 pm |
|
|
hi there tank wet area ? not familiar with that jargon .
All he did was fit 2 toilets one bath and two sinks in a main bathroom and a cloakroom
He fully tiled the bathroom and tiled behind the toilet and sink in the cloak. he does wet rooms but thats what he did for me.
I thought 39 was ALOT but being a naive punter i chose some stuff in wickes and they wanted 2k to fit the white goods only ! and then tiling was 44 to tile plus another charge like 18 to remove the old tiles and make good . So he seemed sort of cheap . The tiles were expensive but not against the shed , and he basically charged about a grand to fit the white goods , maybe more but less than 2k. I should have got more quotes i suppose but was nearly going to get the shed to do it. I asked in b+q and I think their min charge to install a bathroom is 3k .
Im getting a wickes kitchen done and thats 3k to fit . im letting them do that as in my opinion there is alot more work involved than 50% more than the bathroom bits ( toilet bath sinks ) |
|
| Back to top |
|
|
|
 |
ei8htbuildingservices

Joined: 28 Mar 2012 Posts: 13 Location: London, United Kingdom Thanked: 2 times
|
|
| Back to top |
|
|
|
 |
andrew17

Joined: 12 Jan 2010 Posts: 47 Location: Suffolk, United Kingdom
|
Posted: Mon Apr 02, 2012 3:14 pm |
|
|
not exactly --its all through wickes and ive got a loan on the kitchen which hasnt drawn down yet. interest free for 6 months provided you pay it off in that time . |
|