Hi people,
I have seen people saying that cavity wall insulation should be continued at the eaves to meet the loft insulation.
My question is, should I extend the celotex level with the top of the joists and then butt the loft insulation up against this or continue the loft insulation past the wall plate and down to meet the celotex?
Hope that makes sense.
Thanks in advance.
I have seen people saying that cavity wall insulation should be continued at the eaves to meet the loft insulation.
My question is, should I extend the celotex level with the top of the joists and then butt the loft insulation up against this or continue the loft insulation past the wall plate and down to meet the celotex?
Hope that makes sense.
Thanks in advance.