Hi I wondered if you guys could give me some advice. I am fitting a new wc in my bathroom and intend to drill through the wall and pick up the 4" cast iron waste that comes from the WC before going down the external wall. I intend to cut out a 6 foot length of cast using a grinder then fit a plastic pipe using timesaver couplings. The only thing I am a bit concerned about is that to fit the tee piece to pick up the new toilet I need to fit a 90 deg bend and it looks a bit tight to get the bend to come off the t piece and pick up the new WC- can I get a special short radius bend or a T with a socket fitting instead of the marley fitting- or can I use a 67deg fitting and turn the tee to get a shorterrise on it?
any advice would be appreciated - I wonder how much movement I will get on the timesavers and the kwik coupling that will be connecting the t Piece to the WC via a short bit of plastic pipe going through the wall?
any advice would be appreciated - I wonder how much movement I will get on the timesavers and the kwik coupling that will be connecting the t Piece to the WC via a short bit of plastic pipe going through the wall?