About 6 months ago I had a deck 3x4 metres built which I am happy with,
apart from about 3 lengths of board at one side seem to hold the rain a bit longer than the others boards (there is not much of a gap between any of the boards about 4or 5 mm ) before it drains. I was thinking of drilling a few 5mm holes along the length of the 3 problem boards. does this sound like a reasonable idea any other sugestions deck is raised 300 mm
Thanks.
apart from about 3 lengths of board at one side seem to hold the rain a bit longer than the others boards (there is not much of a gap between any of the boards about 4or 5 mm ) before it drains. I was thinking of drilling a few 5mm holes along the length of the 3 problem boards. does this sound like a reasonable idea any other sugestions deck is raised 300 mm
Thanks.