Right First Post on this forum.
I had a cracked internal soil stack right on the rest bend recently and got a local plumbing firm to replace the whole stack externally instead of internally.
I have attached a few pictures of it.
1. What do you think of the job? Is this the standard way to do it?
2. I need to concrete in the hole shall I do it in stages so it don't put to much pressure on the pipework?
3. The clay old rest bend bit is still stuck in the bricks will this be OK to concrete in?
4. Is there any considerations for me to make before I concrete in? Damp??
Many Thanks View media item 5972 View media item 5973 View media item 5974 View media item 5975 View media item 5976
I had a cracked internal soil stack right on the rest bend recently and got a local plumbing firm to replace the whole stack externally instead of internally.
I have attached a few pictures of it.
1. What do you think of the job? Is this the standard way to do it?
2. I need to concrete in the hole shall I do it in stages so it don't put to much pressure on the pipework?
3. The clay old rest bend bit is still stuck in the bricks will this be OK to concrete in?
4. Is there any considerations for me to make before I concrete in? Damp??
Many Thanks View media item 5972 View media item 5973 View media item 5974 View media item 5975 View media item 5976