I had a survey done with a view to having my combi boiler replaced when the question earth bonding came up.
The surveyor informed me that the pipes going into the unit would have to be bonded.
I have read a recent post by johnD that there is no reg. that says this must be done and I fully accept this as fact.
However, since this is the way the man says it has to be done then so be it. so in the absence of any earth bonding cable in the vicinity I am going to run a cable in preparation.
The thing I need to know is if 6mm cable woul be ok or does it have to be 10 mm.
My main earthing is from a pme system.
The surveyor informed me that the pipes going into the unit would have to be bonded.
I have read a recent post by johnD that there is no reg. that says this must be done and I fully accept this as fact.
However, since this is the way the man says it has to be done then so be it. so in the absence of any earth bonding cable in the vicinity I am going to run a cable in preparation.
The thing I need to know is if 6mm cable woul be ok or does it have to be 10 mm.
My main earthing is from a pme system.