Hello all!!
I was wondering if someone would give me some advice on how long roughly it would take to repair my bathroom after a flood. My insurance is allowing 5 days, is this enough?
work needed doing is:
remove: Bath, sink, toilet, Shower, wall mount cupboard, wall mount towel radiator
Hack off all tiles from floor to ceiling, on all 4 walls,
Take up damaged 22mm flooring and re fit with new 22mm flooring.
patch and skim all 4 walls
paint ceiling
Fit new tiles to all walls
Fit new floor tiles
refit Bath, sink, toilet, Shower, wall mount cupboard, wall mount towel radiator
Thanks
I was wondering if someone would give me some advice on how long roughly it would take to repair my bathroom after a flood. My insurance is allowing 5 days, is this enough?
work needed doing is:
remove: Bath, sink, toilet, Shower, wall mount cupboard, wall mount towel radiator
Hack off all tiles from floor to ceiling, on all 4 walls,
Take up damaged 22mm flooring and re fit with new 22mm flooring.
patch and skim all 4 walls
paint ceiling
Fit new tiles to all walls
Fit new floor tiles
refit Bath, sink, toilet, Shower, wall mount cupboard, wall mount towel radiator
Thanks