Hi
As some may have read other posts of mine, I am thinking about converting my garage to a room, and extending on top of it. Size will be approx 10m x 2.5m.
As a rough guide, how long would it take a crew of 3 to do the following:
- dig the footings
- pour the concrete
- lay the engineers to dpc
- put down hardcore for floor, dpc, insulate and concrete
- build walls up to wallplate in blocks (both skins)
- extend roof over (changing from hip to gable end)
I dont know if I missed any main steps out, but I trying to work out how long it would take to get a shell built and get it water tight
thanks
any advice/info would be great
As some may have read other posts of mine, I am thinking about converting my garage to a room, and extending on top of it. Size will be approx 10m x 2.5m.
As a rough guide, how long would it take a crew of 3 to do the following:
- dig the footings
- pour the concrete
- lay the engineers to dpc
- put down hardcore for floor, dpc, insulate and concrete
- build walls up to wallplate in blocks (both skins)
- extend roof over (changing from hip to gable end)
I dont know if I missed any main steps out, but I trying to work out how long it would take to get a shell built and get it water tight
thanks
any advice/info would be great