Have just dug down to the depth required for my footing for my new porch (2.2m x 1.4) and have found that they is a drain pipe running half and half at the bottom of where my concrete is to be layed. Whats the best way to bridge over this?
Also they is a pad of concrete about 4inch thick at one end of the trench if any one can shed any light on this for me.