I am doing a side return extension AND a rear extension in a terraced victorian. The rear extension would be PD and I have submitted a seperate Lawful Development Certificate application for it.
The side return (as its above 3 metres - it is planned to be 4.5 metres) requires neighbour consent for PD (via the Prior Notification process). The neighbours are not being clear if they will reject it under PD. Otherwise all PD requirements are met (e.g. same materials etc.)
The question is should/can I do a Prior Notification and a full planning application at the same time to maximize my chances of approval? What if one gets rejected and the other accepted - which one would take precedence etc.? The architect is hesitant to do a pre-planning app.
The side return (as its above 3 metres - it is planned to be 4.5 metres) requires neighbour consent for PD (via the Prior Notification process). The neighbours are not being clear if they will reject it under PD. Otherwise all PD requirements are met (e.g. same materials etc.)
The question is should/can I do a Prior Notification and a full planning application at the same time to maximize my chances of approval? What if one gets rejected and the other accepted - which one would take precedence etc.? The architect is hesitant to do a pre-planning app.