So we are in the process of extending our L shape kitchen dinner into a square room. Currently the room has radiators x2. The floor construction is currently block and beam and is tiled. Now the plan is when the extension is done is to have a wet underfloor heating installed. My Question is once completed the two block and beam floors will be at different levels. and will need to be insulated before the underfloor heating is laid, the floor leve on existing will have to come down and possibly be insulated before underfloor heating is installed do I break up the old screed to get it to the same level before the insulating and install?
Hope this makes sense and someone under stands what I'm talking about