What’s the accepted way of building the door threshold in a cavity wall.
The floor is a concrete slab insulated and screeded upto finished floor level and I was wondering the best way to run the floor upto the outer leaf at the door opening.
Seen various ways when I google it but would appreciate any pointers.
The floor is a concrete slab insulated and screeded upto finished floor level and I was wondering the best way to run the floor upto the outer leaf at the door opening.
Seen various ways when I google it but would appreciate any pointers.