Hi
Just been doing some reading and wondering if anyone can confirm my approach. I’m bricking the front of my garage up (half height with a window above it) for my garage conversion. It’ll be brick on the outside block on the inside with a 100mm gap.
Plan is to completely cover the inner wall (inside the cavity) with 70mm PIR and leave a 30mm gap between the PIR and the outer wall.
Do I need to leave a gap where the Pir meets the wall running perpendicular to the wall being made? How do you work Pir round wall ties?
The new wall will be about 2.1 metres wide.
Appreciate any advice.
Many thanks.
Just been doing some reading and wondering if anyone can confirm my approach. I’m bricking the front of my garage up (half height with a window above it) for my garage conversion. It’ll be brick on the outside block on the inside with a 100mm gap.
Plan is to completely cover the inner wall (inside the cavity) with 70mm PIR and leave a 30mm gap between the PIR and the outer wall.
Do I need to leave a gap where the Pir meets the wall running perpendicular to the wall being made? How do you work Pir round wall ties?
The new wall will be about 2.1 metres wide.
Appreciate any advice.
Many thanks.