Hi all,
I've been asked to relocate 3 or 4 rads that are currently supplied by microbore pipes (8mm I think).
After moving the rads can I install the new pipe work in 15mm and then just re-balance the system ?
It's an open vented c/h stystem with f & e tank in the loft.
thanks in advance