Recent content by craigN

  1. C

    Changes to Building Regs

    Thanks Woody for your advice, andalso on the 1/2h fire protection of my ceiling. I'll give the BC a call, it makes sense togo with the latest regs.
  2. C

    Changes to Building Regs

    I got my planning and Building approval about 3 years ago for a rear extension and loft conversion, as the project started with the rear extension I have only just started the loft. The Regs changed in Feb 2007 and I would prefer to go with the newer loft regs for escape and fire protection...
  3. C

    Loft Conversion - Fire protection to floor

    Please can someone advise me of a suitable design to achieve a 30 minute fire protection (or modified 30 minute) to a floor. I currently have a ceiling with 12.5mm plasterboard, artexed and have been advised that I can lay 100mm Rockwool or similar directly onto the plasterboard without any...
  4. C

    Loft Conversion

    I assume from the sticky that this section is just to let everyone know about our projects. I am undertaking a third floor loft conversion, I got planning and Building approval about 3 years ago, but as the project included a ground floor extension I have only just started the loft. I need...
  5. C

    Hello everyone. My name is Craig I am not new to DIY and will attempt anything. Very pleased to...

    Hello everyone. My name is Craig I am not new to DIY and will attempt anything. Very pleased to join the chat and give any advice I can (learned a lot the hard way!). I am an Electronic Engineer, work in large company with many experts to pick their brains. Currently struggling to do a loft...
Back
Top