This is one of those things that frustrates the cr** out of me but I'm sure there's a super simple way.
I'm putting up a dormer - usual stuff: studwork, OSB, membrane, tile battens etc. Attaching the OSB - no probs, I can see/mark the studs. After the OSB is covered with membrane everything is...