Sorry to camp out on this post but I have just done exactly as above, but am not sure how I close the cavitiy along the floor. The DPC is about an inch below floor level.
Unguided I would fill the cavity with concrete, cover the two courses and cavity with a 250mm DPC and concrete over to...