I have two CI stacks : one for the WC, one with a hoperhead for basin and bath waste, with two palstic pipes running into the hoper.
I need to get rid of the second stack.
My problems are:
- is it ok to connect the two plastic 38mm waste pipes into the soil ?
- if yes how ? drilling...