Right thanks for all the advice, this is where I'm up to, pls advise if either of these scenarios will cause any major issues.
1. 3 swept bends
2. 2 swept bends and 2 45's
Thanks
Right thanks for all info guys. Here's my update, would this work ? Is this acceptable, I'm fairly sure there's sufficient fall on the pipe however I know I've used 90 deg bends isn't probably ideal,
What's thoughts?
The battery will be a back up, the 2 wires connected are the switch wires.
Which hive have you bought ? There is a wired version now as well as a wireless.
Where is the room stat going to be located?
The new hive receiver needs to be wired into the boiler terminal strip which means removing...
I'm currently installing an ensuite, just have a slight problem with the shower waste positioning. The tray can only go in this position and the hole for the 40mm shower waste is positioned through the centre of the joist.
I bought a 90mm mcalpine trap for the tray which has a 45 deg offset but...
I'm currently installing an ensuite, just have a slight problem with the shower waste positioning. The tray can only go in this position and the hole for the 40mm shower waste is positioned through the centre of the joist.
I bought a 90mm mcalpine trap for the tray which has a 45 deg offset...