"After the meter, install a henley block to split the tails - 1 set to the CU, another set to a metal box with a switch and an MCB. From there 6mm or 10mm SWA to the shed, terminated in a metal box. Shed CU with RCD protection, and local earth rod."
That sounds like an easier plan.
I am...