OK, so in this order, mains supply, cut and insert T piece, then an isolation valve, then the double check valve with the arrow in the direction of the flow of water, then the pressure reduction valve set at about 1.5 bar, then a 15mm to 22mm adaptor then cut the flow pipe for the sealed system...