    that is an excellent suggestion LiamPope, however, given the the sparks in queestion is an ex-sparks (but not in the ex-parrot sense) and no longer a member of any professional body, and neither trained in the 2008 regs, I'm not sure he is legally able to do that. However, from what I have...
  2. D

    BS7671 2006 vs 2008

    Thanks for your contibutionalso Paul- that was the approach I was intending. Perhaps the mention of statutory requirements will provide the required effect while still keeping my powder dry. After all the discussions here, I don't think I actually have anthing to fear from an actual...
  3. D

    BS7671 2006 vs 2008

    LiamPope: Thanks for your thought- I am increasingly forming the same opinion. Earthing conductor was 16mm squared, equipotential bonding conductors 10mm squared. mikhailfaradayski: Thanks again for your thoughts- it's this sort of real-world input that is very reassuring to have in your...
  4. D

    BS7671 2006 vs 2008

    Thanks mikhailfaradayski That is also quite unequivical! The bottom line is that I want the BC approval with minimum cost and grief. If writing snotty letters gets that done, fine. If 1-200 quid can sort it in less then geological timescales, also fine. There is no doubt that the work...
  5. D

    BS7671 2006 vs 2008

    mikhailfaradayski: It's a bit cheeky I know, but would you be willing to post a summary of the introduction on P4 of the BS7671:2008 regs please? kind regards, djb
  6. D

    BS7671 2006 vs 2008

    HI BAS, If the bottom line is that I will have to pay for a part P self-cert qualified sparky to make some mods to the current installation, then I don't see that I've got that much to lose by a bit of reasoned agitation with both BC and their sub-con (clearly while attempting to keep them...
  7. D

    BS7671 2006 vs 2008

    one, possibly final (I make no promises!) question from me: Looking at the link BAS kindly provided regarding the differences between 16th and 17th regs one thing concerned me: "There are now requirements for emergency escape lighting and fire protection applications" Does this mean...
  8. D

    BS7671 2006 vs 2008

    Davelx: "They mostly didn't/don't have anyone with any electrical qualifications or training or test equipment, so if they have to inspect/test they have to sub it out - but they have no budget for that either" That would appear to be the case here, as they have immediately sub-contracted the...
  9. D

    BS7671 2006 vs 2008

    LOL! I must try to erase your colourful imagery lest it leak out at an unfortunate moment... ;) I agree with the sentiments of dealing with the council. The best one can hope for is a slow, but cheap outcome! Re insulation: I understood that wires were supposed to run over the top of...
  10. D

    BS7671 2006 vs 2008

    Hi All, Thanks again for your thoughts! You have all been substantially more helpful than I could have hoped for! As I see it I have three ways forward from this point: 1) Easiest/best option: Show/allow an inspection that shows the installation as performed actually does meet...
  11. D

    BS7671 2006 vs 2008

    Thank you all again- some very interesting points! To answer some specific points: Andprk- Two RCD's, one lighting, one sockets. (and only a shaver socket in the bathroom, and a ringmain spur to the boiler, no shower) Bongos: I have heard this once before- do you have a reference I...
  12. D

    BS7671 2006 vs 2008

    HI All, Thanks again for your help with this, it is much appreciated. I have attached the full detail of the correspondance to date- hopefully the images are clear enough, but if some details are needed and obscure I can clearly provide them Does this help shed some light on a...
  13. cert p4

    cert p4

  14. cert p3

    cert p3

  15. Cert P2

    Cert P2

  16. Cert P1

    Cert P1

  17. Result of LABC "inspection"

    Result of LABC "inspection"

  18. Letter from LABC

    Letter from LABC

  19. electrical storm

    electrical storm

  20. D

    BS7671 2006 vs 2008

    Thank all, and a few answers: - On the form I filled in (here: http://www.winchester.gov.uk/Documents/BuildingControl/BC0072-22230%20building%20notice.pdf) I simply stated that I wished the installation to be inspected (without testing), and enclose an appropriate fee. I didn't state that...