Search results

  1. M

    Door frame sealant/putty

    Hi, I need to replace the sealant/putty around my door frame before repainting it. But I'm having trouble working out what it's called and therefore having limited success with google. I've attached two photos, it has a sandy texture and is about an inch thick across the back two...
  2. M

    Dot and dab with bonding

    Quick question, Can you attach plaster boards via dot and dab using bonding coat rather than plasterboard adhesive? Thanks in advance for your help
  3. M

    Junction Box Accessibility

    For the purpose of strict adherence to the regulations, would you consider a junction box to be accessible if it was at the end of a 6m crawl under the eves? The space is partially boarded and access is via a door/hatch if that makes a difference. Cheers
  4. M

    EICR code question

    Quick question, in an EICR, what code would the following attract An 8.5kW shower fed by a 6mm^2 clipped to the cellar joists/wall and imbedded in the external wall protected by a 32A MCB (no RCD) The same setup but with 4mm^2 twin and earth instead of 6mm^2? Thanks in advance
  5. M

    Double Pole Isolator

    Hi, I need to get an isolator fitted between the meter and consumer unit as a prelude to getting someone in to sort out my consumer unit. I'm in Leeds and get electricity from British Gas. Can anyone tell me if I need to contact BG or Northern Power Grid (new YEDL) and does anyone have...
Back
Top