Hi, can anyone offer advice please?
I have a 20ft x 12ft mesh-enforced, insulated and DP'd, concrete slab that I have planned to build a garden workshop onto.
Because I was originally going to build a wooden construction, the formwork was built with a 2% fall - or 3" slope down the 12ft sides...