excuse the imprecise terms & long Q - to preface I’m ok with the wiring in this case, just a basic Q about starting; currently in place is a 2 gang switch and a fuse switch alongside (for a boiler) - embedded in the wall is one metal box, with two sections for the gang/fuse. I need to install a...