I'm just exploring installing UFH in a suspended joist G/f.
The plan at this stage is to PIR insulate between joists, lay pipes, then screed over.
I am now unsure what to do next....
I would like a wood floor (real or fake!).
Does one put down the original T&G floorboards and sand/seal? Or...