The supply is TN-S. Gas, water and elec pipes all come in at the same point with elec meter only just a couple of feet away. The equipotential bonding, and earth cables to the existing and the 'to be replaced' box are all around 4mm in size (ie way below the 10mm). The meter tails are 25mm...