I bought a house that i am in the process of renovating. I've pretty much done the wiring and its been inspected next week. The thing i'm stuck on is the bonding.
Here is the set up -
Gas Supply - Plastic Pipe from street onto Meter, copper from meter to boiler (about 8 meters)...