The situation is an electric shower (9.5kw@240V, 10mm2 cable, 9m long, conduit and clipped direct, no thermal insulation) and electric boiler (10kw@240v, 16mm2 cable, 10m long, clipped direct between floors).
To prevent overloading the 100A main fuse, the shower and boiler are connected using...