Guys
See the attached picture. The Henley block you see has the main tails going in from the meter and then two old 16mm tails coming out from the block to the CU. Unless I'm mistaken to comply with regs these tails now have to be 25mm. (TNS system) 25mm will not fit into the load side of the Henley block. What is the best way to convert this?
Also some advice please. The other tails you see are the supply to the house next door. The insulation on the N and CPC look pretty amateurish. Is this common? Is it legal? Should they be changed?
Cheers
[/img]
See the attached picture. The Henley block you see has the main tails going in from the meter and then two old 16mm tails coming out from the block to the CU. Unless I'm mistaken to comply with regs these tails now have to be 25mm. (TNS system) 25mm will not fit into the load side of the Henley block. What is the best way to convert this?
Also some advice please. The other tails you see are the supply to the house next door. The insulation on the N and CPC look pretty amateurish. Is this common? Is it legal? Should they be changed?
Cheers