Hi all
Im in the process of getting a new drive layed. Its a long story but desperately waiting for the guy to come back any time now. Anyway recently been looking at plugin hybrids as the missus needs a new car and that led on to upgrading the supply comming into the house and some fast chargers need 3 phase
Im new to all this so please correct me - havnt got a clue really
I know a colleague in work recently had a 3 phase put in (and I did wonder why when he mentioned it) at home at a cost of around 6K. I havent got that money for it and right now I have no need of three phase at all but as this drive is totally up..... now would be the time to lay a conduit possibly just in case
I dont know - would that be a good idea do you think. I think the duct has to be 450mm down but I am not 100% sure - national grid wernt that great when I called them earlier
I dont fancy digging another trench but if Im going to do it now would be a good time I suppose or is it pointless in the home environment
Thanks for any advice
Im in the process of getting a new drive layed. Its a long story but desperately waiting for the guy to come back any time now. Anyway recently been looking at plugin hybrids as the missus needs a new car and that led on to upgrading the supply comming into the house and some fast chargers need 3 phase
Im new to all this so please correct me - havnt got a clue really
I know a colleague in work recently had a 3 phase put in (and I did wonder why when he mentioned it) at home at a cost of around 6K. I havent got that money for it and right now I have no need of three phase at all but as this drive is totally up..... now would be the time to lay a conduit possibly just in case
I dont know - would that be a good idea do you think. I think the duct has to be 450mm down but I am not 100% sure - national grid wernt that great when I called them earlier
I dont fancy digging another trench but if Im going to do it now would be a good time I suppose or is it pointless in the home environment
Thanks for any advice