Hello, i'll explain the situation.
Overhead lines were replaced and are now underground.
New met installed at bottom of field.
I have 25mm tails coming out the the met into a 100A switch fuse.
Their is a 50mm 3c swa traveling underground to the house.
At the house their is another 100A switch fuse with 25mm 3c swa going to a CCU 15 metres away.
50mm swa does not fit in the 100A switch fuse; my thoughts were to have 25mm tails coming out of the switch fuse and into something to connect to the 50mm swa. i have a few ideas on how to overcome the problem one them being line taps and some kind of busbar chamber to lug the tails onto the rail.. but not convinced its the correct way! would be great if you sparkys could share your knowledge on what you would do.
thanks
carlos
Overhead lines were replaced and are now underground.
New met installed at bottom of field.
I have 25mm tails coming out the the met into a 100A switch fuse.
Their is a 50mm 3c swa traveling underground to the house.
At the house their is another 100A switch fuse with 25mm 3c swa going to a CCU 15 metres away.
50mm swa does not fit in the 100A switch fuse; my thoughts were to have 25mm tails coming out of the switch fuse and into something to connect to the 50mm swa. i have a few ideas on how to overcome the problem one them being line taps and some kind of busbar chamber to lug the tails onto the rail.. but not convinced its the correct way! would be great if you sparkys could share your knowledge on what you would do.
thanks
carlos