View media item 84357
Hi guys, I've taken the time to draw this so I'm hoping to get some decent feedback.
I want to know how I can achieve better access to the floor of this shower/bathroom.
Having tiled the floor it's impossible to get access to the pipes so what can I change to achieve this ?
In truth I wanted to change the plastic from compression to solvent weld and I want to be able to get underneath for any future maintenance also.
The area with the manhole has been cemented, the other 2/3rds of the floor construction is as per the drawing. I used the timber to bring up the floor level with the existing cement upstand
Any questions please ask away
Hi guys, I've taken the time to draw this so I'm hoping to get some decent feedback.
I want to know how I can achieve better access to the floor of this shower/bathroom.
Having tiled the floor it's impossible to get access to the pipes so what can I change to achieve this ?
In truth I wanted to change the plastic from compression to solvent weld and I want to be able to get underneath for any future maintenance also.
The area with the manhole has been cemented, the other 2/3rds of the floor construction is as per the drawing. I used the timber to bring up the floor level with the existing cement upstand
Any questions please ask away