I need to add a rad, only a few feet from where the boiler flow/return pipes pass before entering the ceiling void.
Would I be correct in thinking I cannot simply T-off of these to install the rad as its before the pump? The pump being located upstair in the airing cupboard.
Therefore I would need to run 2x15mm pipes from further up the system, back past the main flow/return? Which is quite do-able - just means more copper and more boxing in
Would I be correct in thinking I cannot simply T-off of these to install the rad as its before the pump? The pump being located upstair in the airing cupboard.
Therefore I would need to run 2x15mm pipes from further up the system, back past the main flow/return? Which is quite do-able - just means more copper and more boxing in