Before I start, I appreciate that there are a lot of variables to consider and jobs should be seen before quoted but hear me out...
Location: Glasgow
Room 1: Living Room
Floor - 4800 x 3800mm
Wall Height - 2580mm
Considerations: Chimney Stack with rounded vert ext angles (has a round profile moulding in the corners) which will need an alum beading to square off.
Room 2: Kids Bedroom
Floor - 3620 x 2510mm
Wall Height - 2400mm
Considerations: This is a basic rectangular room, nothing fancy but there is a strip of ply boarding in the corner which I assume is boxing something in, so I might need to replace with some plasterboard.
Say Walls Total 74m2 & ceilings total 27.50m2.
I'm going to strip off the existing coverings back to the existing plaster... most walls are brick/block with plaster. I'm looking to skim both walls and ceilings, square it all off and modernise the look for both rooms.
I was quoted £930 all in.
It's the first quote I've received but I explained to the lad who came round that I'm basically looking to get the entire house complete in short order but at this price, I don't think I can afford it.
Can you give us some guidance on what I should expect to pay per room. If you need any other info, let us know.
Location: Glasgow
Room 1: Living Room
Floor - 4800 x 3800mm
Wall Height - 2580mm
Considerations: Chimney Stack with rounded vert ext angles (has a round profile moulding in the corners) which will need an alum beading to square off.
Room 2: Kids Bedroom
Floor - 3620 x 2510mm
Wall Height - 2400mm
Considerations: This is a basic rectangular room, nothing fancy but there is a strip of ply boarding in the corner which I assume is boxing something in, so I might need to replace with some plasterboard.
Say Walls Total 74m2 & ceilings total 27.50m2.
I'm going to strip off the existing coverings back to the existing plaster... most walls are brick/block with plaster. I'm looking to skim both walls and ceilings, square it all off and modernise the look for both rooms.
I was quoted £930 all in.
It's the first quote I've received but I explained to the lad who came round that I'm basically looking to get the entire house complete in short order but at this price, I don't think I can afford it.
Can you give us some guidance on what I should expect to pay per room. If you need any other info, let us know.