IF I`d been asked to do it I would have surveyed the state of the lead and if OK but just split I would have burned a patch over the split. AS LONG as Chris could access the underneath of the roof - and lay there with a hose on standby . firewatching . £20 materials .£80. labour - because Chris is a Good Guy here @ diynot