Hi
Can anyone help me with this?
I have a bath and frame/legs and can't figure out in which order to install the bath.
The materials for the bath frame consist of the following:-
2 steel rods which attach to the bottom of the bath
4 feet which screw to the floor
4 steel threaded bars which screw to the feet and held in place with nuts at one end and into 4 plastic locking blocks within the 2 steel rods at the other end.
4 clips which screw to the wall and clip to underside of bath edge
My problem is working out the sequence in which all these things come together. can anyone help? Sorry I have no photos and the place where I bought the bath are just salesmen (clueless) and there where no instructions in any boxes of the frames.
Can anyone help me with this?
I have a bath and frame/legs and can't figure out in which order to install the bath.
The materials for the bath frame consist of the following:-
2 steel rods which attach to the bottom of the bath
4 feet which screw to the floor
4 steel threaded bars which screw to the feet and held in place with nuts at one end and into 4 plastic locking blocks within the 2 steel rods at the other end.
4 clips which screw to the wall and clip to underside of bath edge
My problem is working out the sequence in which all these things come together. can anyone help? Sorry I have no photos and the place where I bought the bath are just salesmen (clueless) and there where no instructions in any boxes of the frames.