I am laying out cabling in a loft extension, an electrician will come and finally test and certify.
All pipework down by the boiler is linked and bonded to the incoming gas pipe.
I would like to know if I still need to bond metal pipework (and metal objects) in the new bathroom in the loft.
A new 17th Edition CU is being fitted, I understand if it is protected by RCD protection no bonding for this new bathroom is required, could someone please advise.
Thanks