Hello all,
I'm hoping to have a bathroom re-done, but budget a bit tight.
I want to have the floor tiled. However, found that the additional cost for providing tiles, adhesive & labour is a significant part of the cost (~£1k)
My question is - is it possible to floor tile a bathroom after the toilet, shower, bath and sink are in?
The builder will do the floor with 12mm WBP ply.
Is it possible for him to fit the suite in some way so it can be tiled after?
e.g. (plywood) spacers under toilet & sink, cut to be smaller that the footprint so that a tile edge can be fitted under. But not sure about bath side panel (unless a gap is planned equal to tile thickness + adhesive). And poss shower tray.
I have tiled a couple of times before, so feel able to do it, but just figure I can't ask him to stop mid-job before the suite goes in. Was wondering if tiling post-fitting is viable.
Thanks in advance for any advice.
I'm hoping to have a bathroom re-done, but budget a bit tight.
I want to have the floor tiled. However, found that the additional cost for providing tiles, adhesive & labour is a significant part of the cost (~£1k)
My question is - is it possible to floor tile a bathroom after the toilet, shower, bath and sink are in?
The builder will do the floor with 12mm WBP ply.
Is it possible for him to fit the suite in some way so it can be tiled after?
e.g. (plywood) spacers under toilet & sink, cut to be smaller that the footprint so that a tile edge can be fitted under. But not sure about bath side panel (unless a gap is planned equal to tile thickness + adhesive). And poss shower tray.
I have tiled a couple of times before, so feel able to do it, but just figure I can't ask him to stop mid-job before the suite goes in. Was wondering if tiling post-fitting is viable.
Thanks in advance for any advice.