Just been to look at a little job of installing a supply for a BMS.
It’s only a small panel and needs a 32A SP&N supply
I have the option of supplying it from either the main panel board via an MCCB, or a local dist board via an MCB.
Either supply is about the same amount of work, but I was just wondering what most people would prefer to do.