Have ordered plants for new hedge. Just finished cultivating the site only to find that there is (what I assume to be) a buried concrete path along the final bit of the planting area (final 3 to 4 meters). The concrete is 25 cm ish below the surface.
I guess am concerned that it's protecting utilities, drains not in this area as far as I can tell. However water gas and electricity are on this side of the house.
How do I ensure I don't damage something important?
I guess am concerned that it's protecting utilities, drains not in this area as far as I can tell. However water gas and electricity are on this side of the house.
How do I ensure I don't damage something important?