Hi there..
I have a set of brick and slab steps which lead up to a gravel path.
The way they have been built means the rise of the steps is 2 courses high each step. At the final step there height to the next level means that a course of 3 bricks have been placed which then leads onto a gravel path...
The 3 courses of brick looks odd... and is a real step over onto the gravel path... if I were to reduce it to 2 courses the gravel would just kick over down the steps (2 courses of cricks at the top brings the steps upto gravel path level)
Does anyone have any suggestions of maybe a topper i can put across the 2nd course to retain the gravel but not be such a big step over and that would give a finished look. At present the 3rd course of brick is an obvious step over and looks rather unfinished....
Id love to post pics but my camera is n/a so i've described above as best I can.... any help is very very much appreciated...
Dougie
I have a set of brick and slab steps which lead up to a gravel path.
The way they have been built means the rise of the steps is 2 courses high each step. At the final step there height to the next level means that a course of 3 bricks have been placed which then leads onto a gravel path...
The 3 courses of brick looks odd... and is a real step over onto the gravel path... if I were to reduce it to 2 courses the gravel would just kick over down the steps (2 courses of cricks at the top brings the steps upto gravel path level)
Does anyone have any suggestions of maybe a topper i can put across the 2nd course to retain the gravel but not be such a big step over and that would give a finished look. At present the 3rd course of brick is an obvious step over and looks rather unfinished....
Id love to post pics but my camera is n/a so i've described above as best I can.... any help is very very much appreciated...
Dougie