So near, yet so far. My £14.5k budget is blown. Recon I need another £3.5k to finish the extension ready for the kitchen.
To be honest, all the early stuff was right on my costings..... suppose it’s easy to price up concrete, blocks, wood and tiles. Just the latter stages has cleaned me out, £50 here, £50 there soon adds up.
Basically short of plaster board, plaster, fixtures, fittings, lighting, flooring, rads and render.
Going to have to become a rent boy I think. Any takers? In and out calls available. Can be paid in materials.
To be honest, all the early stuff was right on my costings..... suppose it’s easy to price up concrete, blocks, wood and tiles. Just the latter stages has cleaned me out, £50 here, £50 there soon adds up.
Basically short of plaster board, plaster, fixtures, fittings, lighting, flooring, rads and render.
Going to have to become a rent boy I think. Any takers? In and out calls available. Can be paid in materials.