Folks
I've looked in other threads to save putting one up but can't find what I'm after
I'll be building a step into the middle of the two sleeper walls. It won't be a whole sleeper's length wide, but a flagstone width of 600mm.
Do I need to dig tout he entire space for the step, right to the bottom level of all of it? Or just dig out each layer?
I was going to create boxes almost with railway sleepers and then fill them with compacted hardcore and then mortar and stone.
I'm up to speed with many things in the garden these days, but not quite sure which way to attack this one.
Cheers
I've looked in other threads to save putting one up but can't find what I'm after
I'll be building a step into the middle of the two sleeper walls. It won't be a whole sleeper's length wide, but a flagstone width of 600mm.
Do I need to dig tout he entire space for the step, right to the bottom level of all of it? Or just dig out each layer?
I was going to create boxes almost with railway sleepers and then fill them with compacted hardcore and then mortar and stone.
I'm up to speed with many things in the garden these days, but not quite sure which way to attack this one.
Cheers