Hi all,
So bathroom has been finished and building control came out today and want a Part P certificate. Seems fair but this document implies we don’t need one.
There is no new circuit.
There is no electrics in zone a.
There are spotlights on existing lighting circuit accessible from loft.
There is an electric mirror from an FCU accessible from bedroom.
There is no electric shower but is an aquaLisa visage digital mixer accessible from bathroom.
This is all protected by an MCB in the fuse box.
Am I right in assuming of nothing in zone a, no part p Needed?
So bathroom has been finished and building control came out today and want a Part P certificate. Seems fair but this document implies we don’t need one.
There is no new circuit.
There is no electrics in zone a.
There are spotlights on existing lighting circuit accessible from loft.
There is an electric mirror from an FCU accessible from bedroom.
There is no electric shower but is an aquaLisa visage digital mixer accessible from bathroom.
This is all protected by an MCB in the fuse box.
Am I right in assuming of nothing in zone a, no part p Needed?