Complicated one
I have an agreed long term lease on a space at a social club. It is an upstairs unused area that was started years ago (20+) and never finished. I do not need to make any alterations apart from to stud/insulate the walls, add a dropped ceiling, and a toilet facility, that will be directly above the clubs toilet and plumb into their waste. I have builders and electricians ready to go.
The club want to have the improvements signed off, however as I am paying over £15K for this project I do not want inspectors turning up after work and asking for the rest of the club to comply to rules and regs in order to sign off my 1 area. This would stop my project and if the club do not change their old standard wiring/insulation etc would the whole thing of been a waste.
Does anyone know about this type of thing or a way around it.
Thank you
I have an agreed long term lease on a space at a social club. It is an upstairs unused area that was started years ago (20+) and never finished. I do not need to make any alterations apart from to stud/insulate the walls, add a dropped ceiling, and a toilet facility, that will be directly above the clubs toilet and plumb into their waste. I have builders and electricians ready to go.
The club want to have the improvements signed off, however as I am paying over £15K for this project I do not want inspectors turning up after work and asking for the rest of the club to comply to rules and regs in order to sign off my 1 area. This would stop my project and if the club do not change their old standard wiring/insulation etc would the whole thing of been a waste.
Does anyone know about this type of thing or a way around it.
Thank you